“It’s going to be a full redesign of the 3,000-room Mirage Tower, a full redesign of the casino, a redesign of the pool, and there will be an additional pool for the guitar tower,” Frank Casella told the Nevada Gaming Control Board. Original article: https://www.reviewjournal.com/business/casinos-gaming/full-redesign-underway-hard-rock-exec-gives-update-on-mirage-transition-3265986/

LEAVE A REPLY

Please enter your comment!
Please enter your name here